Page 11 T80si pumped Screw the two upper fixing screws into position Fig. Hook the backplate over the top screws and fit the lower fixing screw into position. The cable entry points are shown in fig.
The cable can be surface clipped, hidden or via 20 mm conduit. Before normal operation of the WA shower, it is essential the following commissioning procedure is completed correctly. The first operation of the shower is intended to flush out any remaining unit debris, and to make sure the heater unit contains water before the elements are switched on.
The socket on the end of this lead must be connected to the plug that is situated at the bottom of the right-hand side of the backplate unit fig.
Before normal operation of the Power on indicator WA shower, it is essential the following commissioning procedure is completed correctly. This indicates that power is on to the pump and power selector. Low water pressure cut-out Full It is essential that this operation is carried out by a competent person. Description Part No. Motor and pump assembly 2. Connecting pipe — lower Connecting pipe — upper 3.
Thermal cut-out 4. Terminal block 5. Can assembly 8. Table Of Contents. Quick Links. Table of Contents. The shower installation MUST be carried. The showerhead and hose supplied with this product are a safety. Failure to use genuine Triton parts. European Union Registered Design No.
Previous Page. Next Page. Thames dual control thermostatic mixer shower with diverter 20 pages. Concentric exposed thermostatic mini mixer shower 21 pages. Failure to use genuine Triton parts critical part of your shower.
Failure to use genuine Triton parts may cause injury and invalidate your guarantee. It must thaw out before using. Page 3: Table Of Contents Cleaning and user maintenance shall not be made by children without supervision. Thermal safety cut-out 5.
Power selector assembly 6. Can and element assembly 7. Under these conditions, rewireable fuse. Instead use a suitably rated T80si electric shower derating factors apply and it is necessary to Miniature Circuit Breaker MCB or cartridge select a larger cable size. Page 8: Water Requirements If it is intended to operate the shower at pressures above the maximum or below the minimum stated, contact Triton Customer Fig. Check there are no hidden cables or pipes before drilling holes for wall WA plugs.
Use great care when using power tools near water. The use of a residual current device RCD is recommended. Page Electric Shower T80si electric shower If side entry is required, the cover will have to be Fig. Carefully remove the appropriate area by using a knife or junior hacksaw fig.
If installing a feed pipe from the back or bottom, the centre of the inlet valve to the wall surface is 20 mm fig. Plumbing to be carried out before wiring. The cable can be surface clipped, hidden or via 20 mm conduit.
Note: Conduit entry can only be from rear. To check that the temperature control is correctly positioned on the stabilising valve temporarily place the cover in position so that the splines engage and rotate the temperature control fully anti-clockwise.
Before normal operation of the WA shower, it is essential the following commissioning procedure is completed correctly. The first operation of the shower is intended to flush out any remaining unit debris, and to make sure the heater unit contains water before the elements are switched on. Before normal operation of the Power selector WA shower, it is essential the following Cold commissioning procedure is completed correctly.